Sunday, 19 February 2017

Finale assessment

In preparation for filming our live assessment, both shows were facing issues.
We are London,werewere having problems when it came to casting their The performers  coming from outside of college and being in different subjects where we found they were busy at the times that we were ready to do rehearsals which made run-throughs quite  tedious do you to the fact there is no feelings for the performance . Mainly my group happily giving up runthrough time in order for the other group to be practice the student social challenge As a team felt that we were ready ready and prepared for live-filming. My group social challenge did not face many casting issuesbecause our answers were made up of people from the other team which means that timetable was free at the same time as ours and they were able to film at anytime  however we did have you to disagreements between our presenter and members of the team who is in the present had to drop out of the road leaving our team with messy run-throughs which members of both teams had resolved and lead us to get back on track.
 We still felt as though we were ready compare to that of a shoe which is why we went first with the live assessment on the Wednesday but after filming we looked over the footage And we felt as though it looks very messy because of the lack of transitioning between shots and bad camera shots and angles.So we reschedule to film the footage again on Friday however this message did not get across to all of our production crew and we were missing our sound director  which meant our sound to make so had to take over both roles which helped us to do well with the final show we also were missing to cast members our shoot originally had three people in each team but due to those who were missing we only had two which barely effected our end result preformance

Wednesday, 11 January 2017

11/01/2017 studio

yesterday it was social challenges run through of the show, as I forgot to bring in my ipad and that is an important part as my roll of being in charge of teleprompter, I had to take up the job of lighting however this wasn't a down fall as I found this was quite a fun job so I had decided to stick with this job along side teleprompter. me and zack were inside of the studio figuring out the correct lighting and music/ effects that would work for the show, we were also able to do this by communicating with the floor manager maarya and she instructed us based on the happenings on the set as we did not have microphone set up in the studio in order the hear what was happening on the other side.

after this session Danielle had a meeting with the whole class sorting ipads and other studio arrangements for the both teams.

Monday, 9 January 2017

09/01/17 tube strike

unfortunately the wasn't a lot of productivity for the project today due to tube strikes and students being unable to make it to lesson. our teacher sent of to get on with our individual work and planning for our TV shows.

Wednesday, 4 January 2017

wednesday 4th january 2016/team 1 run through

today we are London went through their practice run of their show, we were unable to use the studio due to it being booked in Wednesday . today the equipment was properly set up. with the ipads finally having tripods for better filming quality. we also learn how to film with the multi camera software on the ipads.
we found out that we are London practice run are on Monday and social challenge is on Tuesdays,
our final assessed filming days are the 30th and 31st of January.

tuesday 3rd january 2016/ run through team 2

we began our run through of our shows in the studio, my group went first. we discussed roles and distributed scripts to our actors and went to our positions for our roles in production. there was an issue with miss communication in roles which is yet to be resolved but this has not effected our productivity as a team.